Waylander
05-03-11, 15:48
I have a DD Lite 12.0 rail. I'll be putting a gear sector sling plate on the side rail and nearest the barrel nut. Assuming I have three 6" tango down panels, shouldn't the 3&3/4" panels bridge the remaining gap? Or will I need the next shortest panel?
I don't think a 6" + 3&3/4" will cover one whole side of my other rails but I could be wrong. I may have to cut 6" panels there.
I don't think a 6" + 3&3/4" will cover one whole side of my other rails but I could be wrong. I may have to cut 6" panels there.